Day 115, Monday, February 27th, 2017, Livingston Island.
Every day work on board is hard, shifts, guards, the boat doesn’t rest. The work goes on 24 hours non stop. The Sea requires permanent attention: the bridge does not sleep, the engines do not stop, the kitchen does not cease to feed the crew. But, from time to time, there are other joys: a spectacle of whales at sunset, a walk along Caleta Cierva, or a hike to an iceberg!




Base Gabriel de Castilla en Isla Decepción
Blog PERMASNOW – Universidad de Alcalá
British Antarctic Survey
Caminando entre pingüinos
El blog de Rosa M. Tristán
The Antartic Report
Valentín, muchas gracias por seguir manteniendo viva la llama antártica desde la tierra firme. Un abrazo